Constructing the four-hundred-thousand-square-foot facility for manufacturing liquid-fueled rocket engines in just ten months was a true “space race,” as the design changed extensively as the project evolved.
The Centers for Disease Control and Prevention selected McCarthy as construction manager for a high-containment continuity laboratory at the Roybal Campus in Atlanta.