First of two record-size 300-ton melters at federal Hanford waste site reached 2,100°F critical temperature July 20 after shutdown last year due to component overheating.
A joint venture of MWH Constructors and Kiewit Corp will build a $1.25B water filtration facility with a J.W. Fowler- MWH team tapped for a related $550M pipeline project.