Ten years ago, Geoff Neumayr decided he was tired of “doing design and construction by combat.” San Francisco International Airport had completed a master plan for the complex and the front of the airport facilities doing things the traditional way.
This comprehensive adaptive reuse project required lifting a 60,000-sq-ft steel-framed World War Two-era warehouse 12 feet in the air to create a workspace.
The 135,000-sq-ft building marked several milestones—the first multi-story mass timber building in California, the first mass timber building in San Francisco and the longest single-span cantilever floorplates in North America.
This 640,000-sq-ft, 25-story office building is on one of three parcels of the four-acre Fifth & Mission (5M) development in the South of Market District.
This two-story, 78,000-sq-ft pharmaceutical manufacturing facility located at a prominent corner of the owner’s 200-acre headquarters campus was designed to produce innovative drugs.
The 10,000-sq-ft addition to the K-8 independent school includes a variety of unique learning areas for visual arts, robotics and innovation and performing arts, including a 250-seat performance space.