The circular 23,500-sq-ft child development center emphasizes sustainability in ways beyond its large windows, intricate landscaping and extensive use of natural interior finishes, the team says.
The project team says technology played a central role in the $68.3-million plan to construct five dual bridges within an 11-mile section of the planned 1,500-mile Continental 1 international trade corridor, connecting Canada with Florida.
Converting the functionally obsolete cloverleaf interchange connecting I-70 and U.S. Route 19 into Pennsylvania’s first diverging diamond interchange required a traffic control plan to minimize disruptions to the tens of thousands of motorists who travel through the area daily.
The project called for a major traffic change, replacing a congested signal-controlled intersection in a primary commercial corridor with a three-lane roundabout.
Designed by architect Helmut Jahn, the 17-story 1900 Reston Metro Plaza is supported by a structural concrete exoskeleton of sloping columns that form an X on the exterior of the building.
Replacing the concrete open spandrel arch bridge that had served as Pittsburgh’s eastern gateway for nearly a century was more challenging than the original construction.
The two-story building targeting LEED Gold certification serves as a consolidated scientific research facility at one of the largest marine research centers in the country, according to the project team.
The unexpected discovery of a large underground rock formation could have easily derailed construction of this $21.8-million, 76,000-sq ft cancer treatment center.
The team behind this 170,000-sq ft, 70-bed hospital says the project delivered state-of-the-art health care services to a largely rural area in less than two years.
The project team says that preserving the U.S. Capitol’s ornate facade involved “firsts” in the nation for the successful execution of large-scale laser ablation cleaning and stone consolidation to conserve a marble exterior.