This $21-million, 65,000-sq-ft building celebrates Gloucester’s maritime history. The steel and light-gauge metal frame construction includes solar panels, electric car chargers, cogeneration power systems and polished concrete floorings that eliminate floor coverings and adhesives.
When Sacred Heart University became the tenant, what began as a “white box” renovation to save the deteriorating building was transformed into a total custom fit-out midway through construction to renovate and expand this 20,000-sq-ft, century-old community theater.
Hurricane Irene devastated Vermont’s oldest fish hatchery, the Roxbury Fish Culture Station, when it tore through the state a decade ago in August 2011.
Once a fortress-like bunker, the former Powder House Community School was transformed into an inclusive, intergenerational urban village through the extensive collaborative efforts of the CALA project team.
This 10-story, mixed-use high-rise built on the site of the old Spinney & Caldwell Shoe Factory was completed at budget, but it fell behind schedule amid COVID-19.
The primary goal of this $17-million project was to construct and commission two large dry rooms in 15 weeks as part of an effort to make more than 2 million COVID-19 test kits per week.
Lendlease (US) Construction LMB Inc. surmounted both construction and safety challenges with the Pfizer Plasmid DNA – Suites GH project in Andover, Mass.
The new school, which has 1,360 students, was designed to support a STEAM-based curriculum that includes “learning pods, flexible project areas, makerspaces and tech shops including a woodshop, broadcast studio, coding and web/graphic design lab and 3D design and computer-aided design labs,” according to the project team.