The judges selected winning ENR Texas & Louisiana entries based on the following criteria: overcoming challenges and teamwork, safety, innovation, contribution to the industry and community, construction and craft quality, design function and aesthetics.
One of Washington, D.C.'s most distinguished national landmarks, the Lincoln Memorial Reflecting Pool was nevertheless suffering considerable degradation and in significant need of a major rehabilitation.
Related Links: Engineering News Record Architectural Record The $15.8-million skirt restoration of the U.S. Capitol dome, which is composed of nearly 4,500 tons of iron, resolved deterioration and life-safety concerns involving cast-iron decorative and structural elements located at the dome's exterior. Work included interior and exterior lead-paint abatement and repainting of all cast-iron plates and trusses; repair of severely deteriorated cast iron; repair and cleaning of sandstone and historic brickwork; the application of protective epoxy coatings; and drainage redesign and improvements.Paint removal revealed numerous unforeseen challenges. After the removal of lead paint from the original sandstone, lead was still detectable
Related Links: Engineering News Record Architectural Record To comply with new nutrient-discharge limits imposed by the Pennsylvania Dept. of Environmental Protection related to the restoration of Chesapeake Bay, the Altoona Water Authority undertook $65 million in upgrades and the expansion of two wastewater treatment facilities at which existing processes were inadequate.Gwin, Dobson & Foreman designed the compliance project, which upgraded the authority's Easterly and Westerly plants by converting existing tankage to nutrient-removal technology reactors; constructing additional reactors; renovating and adding new final clarifiers; and installing new, high-efficiency aeration systems, UV disinfection systems, headworks and SCADA systems.The project also boosted each
The first launch pad in the U.S. to be built specifically as a multi-user facility to accommodate rockets from private companies, the Mid-Atlantic Regional Spaceport Pad-0A in Wallops Island, Va., enables continued space exploration and aims to foster the development of the commercial space transportation industry.
The five-year, $500-million Clairton C Battery project at North America's largest coke-making facility in Clairton, Pa., delivered a new 960,000-ton-capacity coke battery that improves U.S. Steel's overall environmental performance.
Using existing structural capacity, the University of Virginia added 127,000 sq ft of new space to its teaching hospital, the University of Virginia Medical Center.
In light of rapid growth in Philadelphia's northwest suburbs, Pennsylvania Turnpike officials sought a low-maintenance, cost-effective solution for increased traffic volume at its Valley Forge interchange.