While fast-tracked projects have become the norm, the $42-million design-build reconstruction of Biogen’s biopharmaceutical manufacturing plant carried extra implications for the project team.
The Merritt Island Airport, a public general-aviation airport surrounded by the Banana River Aquatic Preserve, needed a 185-ft extension to its lone 3,601-ft-long runway.
Built in 13 months, Clemson University’s $55-million Allen N. Reeves Football Complex features a locker room with 25,000 sq ft of weight-training space and 50-person lunge and hydrotherapy pools.