In developing its new Campus North Residential Commons project, the University of Chicago saw an opportunity to complete and open facilities a year sooner by using design-build delivery.
This $42.5 million redevelopment and restoration of a portion of the historic Pabst Brewery is one of the largest historic renovations in the state of Wisconsin.
This $83 million renovation was put on hold after construction began as the City of Chicago considered landmark status for the historic historic North Pier Terminal building.
Riddell needed a new manufacturing and office facility for assembly of football helmets and custom shoulder pads. After reviewing multiple properties the company chose North Ridgeville, Ohio.
This design-build team replaced the existing US 69 Missouri River Bridge with a four-lane 2,155-ft bridge composed of a 1,350-ft continuous steel girder unit and an 805-ft pre-stressed concrete girder unit.
The Franklin Avenue Bridge is a 1,000-ft-long, five-span arch structure that opened in 1923. It was in bad need of an update that respected its history.
The Lewis and Clark bridge is roughly half of the $2.3 billion Louisville-Southern Indiana Ohio River Bridges Project, a multi-bridge modernization involving several crossings of the Ohio River between Louisville, Kentucky and Jeffersonville, Indiana.