Built in 1911, the Rose Garden Tea Room at the Huntington Library, Art Museum and Botanical Gardens was originally designed as a billiard room and bowling alley for Henry E. Huntington.
A comprehensive modernization effort transformed the existing Logan K-8 and Memorial Prep campuses into a unified TK-12 complex for the San Diego Unified School District, completed in December 2022.
Designed pro bono by architect Frank Gehry, the Children’s Institute Inc.’s Watts Campus is a two-story, steel-framed facility at the corner of E. 102nd Street and Success Avenue in Watts, Calif./p>
This two-floor renovation was designed with growth in mind. Spanning the 47th and 48th floors of the Wells Fargo Building in Bunker Hill, the project features contemporary design with an interconnecting staircase, an interior water feature, a loggia, green walls and distinctive millwork, lighting and furniture elements.
Three mid-rise buildings spanning 591,000 sq ft comprise one of UCLA’s latest student housing facilities. The complex features apartment-style units and reached completion in October 2022.
North America’s first clean hydrogen powered microgrid and home was completed in October 2022. The nearly 2,000-sq-ft home serves as a demonstration of hydrogen’s capabilities when used in pure form or as a blend to fuel energy systems.
With the expansion and repurpose of an existing 98,000-sq-ft Aerojet facility built in 1985, nonprofit OneLegacy now has the capacity and resources necessary to continue its work as the largest organ, eye and tissue recovery organization in the world.
Spanning more than 600 acres and featuring a 20MW/50MWh battery energy storage system (BESS) component, the 100-MW Rabbitbrush Solar Facility reached completion in November 2022.