Supported by a three-story steel frame and concrete shear wall structure, this 96,000-sq-ft temple features ornamental glass windows with likenesses of local flora and architectural precast panels on the exterior.
After nearly 40 years of providing adaptive outdoor recreational opportunities to individuals of all abilities and ages, including more than 5,400 ski and snowboard lessons each year, the National Ability Center had long outgrown its temporary double-wide trailer and was in desperate need of a long-term solution.
A five-story, 233,681-sq-ft post-tensioned concrete structure clad with decorative perforated metal paneling serves as the Boise Airport’s new employee parking garage.
A 5.3-mile bus rapid transit (BRT) route travels from the Ogden Intermodal Transit Center, through Weber State University’s campus and ends at McKay-Dee Hospital.
A 483,000-sq-ft hospital provides a critical resource for families in Lehi, Utah, featuring a wide range of services such as behavioral health, newborn intensive care, sleep medicine, infusion therapy and physical therapy, and it is designed in a way that promotes better health outcomes.