A former seafood packaging plant is now a 43,000-sq-ft training facility developed to support the growing demand for technicians in the assembly and deployment of offshore wind power turbines.
The 53-story, 1.8-million-sq-ft tower is the world’s largest Passive House office building that also meets WELL Gold and LEED Platinum standards, says the submission./
The 205,000-sq-ft mixed-use life sciences building located in the heart of Union Square features lab-ready infrastructure and flexible and efficient floor plans.
Transforming a long-vacant retail building into a 59,000-sq-ft industrial manufacturing facility using cutting-edge technology and materials required elaborate HVAC and electrical systems to support interior pressurization, a dense equipment layout and extra operational redundancy.
Spanning seven acres, the comprehensive $70-million renovation has revitalized an iconic public space into a vibrant, accessible, and sustainable urban plaza.
Situated on a knoll with a former football field at a lower elevation, the site for the three-story, 212,000-sq-ft building complicated a project that was already challenged by the close proximity of the operating high school.
Veralto, the newly formed offshoot of the life sciences conglomerate Danaher that is dedicated to enhanced water quality and natural reserve protection, sought office space that embodies its commitment to environmental stewardship and technological innovation.
A 19th-century timber building, which previously served as a tannery, now is home to an R&D facility that is developing 3D printed lungs for transplant.<
The $75-million project restores the grandeur of Vermont’s only remaining movable bridge—a 60-year-old twin-leaf bascule structure that had exceeded its useful life. <