When Daniel O’Connell’s Sons won the construction contract in 2018 for the $122-million York Street Pump Station and Connecticut River Crossing project in Springfield, Mass., the owner’s designer, Kleinfelder, suggested pipe jacking to launch three new wastewater conveyance pipelines at the pump station that would run under a railroad and flood wall before crossing the river and passing through a levee to the Springfield Water & Sewer Commission treatment facility in Agawam, Mass.
While many projects across New England remained in a holding pattern with continuing financial uncertainty in another pandemic year, one project finally got out of the gate in 2021 after years of delay.
Solar energy added 9,604 MW through Oct. 31, 2021, up 28% from the same period a year earlier, says the Federal Energy Regulatory Commission. Recent regulation changes in Massachusetts and California are aimed to push development, but with some opposition.
Built to be resilient against future sea level rise, the mixed-use development on East Boston’s waterfront transformed an underutilized area into an active and publicly accessible extension of its surrounding neighborhood.
Updates about construction professionals in New York, New Jersey and New England. The Moles cite two regional executives as 2022 member and non-member awardees for achievement, with awards dinner event set for Jan. 19 in New York City.
The COVID-19 outbreak clearly challenged the construction industry worldwide. Nevertheless, many project teams working across New England managed to more than endure during a difficult 2020.
Completed on budget and on schedule, the $165-million recreation center was the college’s largest capital project and one of the nation’s first complexes to integrate five major athletic venues in a single construction project.
This $21-million, 65,000-sq-ft building celebrates Gloucester’s maritime history. The steel and light-gauge metal frame construction includes solar panels, electric car chargers, cogeneration power systems and polished concrete floorings that eliminate floor coverings and adhesives.
When Sacred Heart University became the tenant, what began as a “white box” renovation to save the deteriorating building was transformed into a total custom fit-out midway through construction to renovate and expand this 20,000-sq-ft, century-old community theater.