Hurricane Irene devastated Vermont’s oldest fish hatchery, the Roxbury Fish Culture Station, when it tore through the state a decade ago in August 2011.
Once a fortress-like bunker, the former Powder House Community School was transformed into an inclusive, intergenerational urban village through the extensive collaborative efforts of the CALA project team.
This 10-story, mixed-use high-rise built on the site of the old Spinney & Caldwell Shoe Factory was completed at budget, but it fell behind schedule amid COVID-19.
The primary goal of this $17-million project was to construct and commission two large dry rooms in 15 weeks as part of an effort to make more than 2 million COVID-19 test kits per week.
Lendlease (US) Construction LMB Inc. surmounted both construction and safety challenges with the Pfizer Plasmid DNA – Suites GH project in Andover, Mass.
The new school, which has 1,360 students, was designed to support a STEAM-based curriculum that includes “learning pods, flexible project areas, makerspaces and tech shops including a woodshop, broadcast studio, coding and web/graphic design lab and 3D design and computer-aided design labs,” according to the project team.
While replacing the existing 15-ft-long concrete slab bridge for this $7.2-million project, the team faced challenges that included compressible soils and tidal conditions. Because a sealed cofferdam was not employed, all work was conducted during 8-ft tidal cycles.
Reconstructing a busy roadway is tough under any circumstances. But undertaking such a major project at Logan International Airport, where hundreds of thousands of passengers arrive and depart each week in cars and buses, presented a host of challenges.