November 2016
More detailed information on the Top Specialty Contractors:
California Top Specialty Contractors by Sectors
Related Article:
Trade Contractors Report Strong Revenue Growth
Rank 2016/2015 |
Company / Location / Website /
Top Officer |
Largest Project To Break Ground
Its Location
Project Value ($ Mil.) |
Market Sectors By % of Revenue |
Regional Rev. 2015 ($ Mil)** |
|
---|---|---|---|---|---|
1/1 |
EMCOR GROUP INC.
Norwalk, Conn. | emcorgroup.com Anthony Guzzi, President & CEO |
Not Provided |
61 Mechanical 39 Electrical |
902.67 |
|
2/2 |
ACCO ENGINEERED SYSTEMS
Glendale | accoes.com John Aversano, Chairman & CEO |
Wilshire Grand Center Los Angeles 51.90 |
83 Mechanical 9 Plumbing |
817.00 |
|
3/4 |
ROSENDIN ELECTRIC
San Jose | rosendin.com Tom Sorley, CEO |
Solverde 1 Lancaster 80.70 |
100 Electrical |
651.11 |
|
4/3 |
CUPERTINO ELECTRIC INC.
San Jose | cei.com John Boncher, President & CEO |
Confidential Solar PV Project Westside 22.90 | 100 Electrical |
590.85 |
|
5/5 |
REDWOOD ELECTRIC GROUP
Santa Clara | RedwoodEG.com Victor M. Castello, President & CEO |
Nvidia Santa Clara 45.00 |
100 Electrical |
350.00 |
|
6/8 |
LARGO CONCRETE INC.*
Tustin | largoconcrete.com Ken Long, President |
Silvery Towers San Jose 44.00 |
100 Concrete |
314.51 |
|
7/6 |
BERGELECTRIC CORP.*
Los Angeles | bergelectric.com William M. Wingerning, CEO |
Sharp Chula Vista Chula Vista 17.65 |
100 Electrical |
309.55 |
|
8/10 |
HELIX ELECTRIC INC.
San Diego | helixelectric.com/ Boris Shekhter, President |
Silvery Tower San Jose 21.95 |
100 Electrical |
262.19 |
|
9/— |
WEBCOR CONCRETE GROUP, A DIVISION OF WEBCOR
CONSTRUCTION LP DBA WEBCOR BUILDERS
San Francisco | webcor.com Jes Pedersen, President & CEO |
Oceanwide Plaza Los Angeles 127.34 |
100 Concrete |
205.04 |
|
10/14 |
BOMEL CONSTRUCTION CO.
Anaheim | bomelconstruction.com Kent Matranga, President |
Alameda Square Parking Structure Los Angeles 66.80 |
100 Concrete |
193.00 |
|
11/13 |
CSI ELECTRICAL CONTRACTORS INC.
Santa Fe Springs | csielectric.com Steve Watts, CEO |
Tranquillity Cantua Creek 38.94 |
100 Electrical |
191.20 | |
12/15 |
CALIFORNIA DRYWALL
San Jose | caldrywall.com Steve Eckstrom, President |
Van Ness Geary Campus San Francisco 65.00 |
97 Wall/Ceiling 3 Painting & Coatings |
172.96 |
|
13/18 |
PACIFIC STRUCTURES INC.
San Francisco | pacific-structures.com Dave Williams, President |
41 Tehama San Francisco 28.70 |
100 Concrete |
137.79 |
|
14/22 |
BAKER ELECTRIC INC.
Escondido | baker-electric.com Ted N. Baker, President |
Stateline Solar - Utility-Scale Solar Project Nipton 20.13 |
100 Electrical |
133.72 | |
15/21 |
KHS&S CONTRACTORS*
Anaheim | khss.com Dave Suder, President |
Not Provided |
37 Wall/Ceiling 30 Interior Finishes/ Millwork 15 Plastering/Drywall |
129.93 | |
16/20 |
THE RAYMOND GROUP
Orange | RaymondGroup.com Travis Winsor, CEO |
Graton Casino Resort Rohnert Park 13.23 |
100 Wall/Ceiling |
127.13 |
|
17/19 |
AMERICAN TECHNOLOGIES INC.
Orange | ATIrestoration.com Gary Moore, President |
717 Olympic Apartments Los Angeles 3.25 |
82 Other Project Types 18 Asbestos/Lead Abatement |
121.06 |
|
18/17 |
SME STEEL CONTRACTORS INC.
Lodi | smesteel.com Wayne Searle, CEO |
Moscone Center San Francisco 47.00 | 100 Steel Erection/
Fabrication |
117.59 | |
19/43 |
HARRIS SUPERIOR CA INC. DBA SUPERIOR AIR HANDLING
San Francisco | superiorairhandling.com Randy Richter, President, Superior Air Handling |
Not Provided |
85 Mechanical 15 Sheet Metal |
116.16 | |
20/12 |
ISEC INC.*
Fremont | isecinc.com Mike Polanchyck, Executive Vice President |
Cathedral Hill Hospital San Francisco 13.75 |
100 Interior Finishes/
Millwork |
114.65 | |
21/— |
WEST VALLEY CONSTRUCTION CO.
Campbell | wvcc.com Kevin P. Kelly, President & CEO |
Stanford West Campus Stormwater System Palo Alto 5.08 |
100 Utility |
112.63 | |
22/— |
PACIFIC RIM MECHANICAL CONTRACTORS INC.
San Diego | prmech.com Joe Mucher, President |
Illumina B6 San Diego 22.36 |
100 Mechanical |
112.00 | |
23/23 |
W. BRADLEY ELECTRIC INC.
Novato | wbeinc.com Leslie Murphy, CEO |
Google One Market Plaza San Francisco 13.38 |
100 Electrical |
93.00 | |
24/31 |
COLLINS ELECTRICAL CO.*
Stockton | collinselectric.com Eugene C. Gini, President & CEO |
FedX Tracy 8.26 |
100 Electrical |
87.29 | |
25/29 |
BEST CONTRACTING SERVICES INC.
Gardena | bestcontracting.com Moji Tabazadeh, President |
Transbay Transit Center TG13.2 No. BY2 San Francisco 22.67 |
68 Roofing 17 Sheet Metal 12 Other Project Types |
85.59 | |
26/— |
MASTEC INC.
Coral Gables, Fla. | MasTec.com Jose R. Mas, CEO |
Not Provided |
100 Other Project Types |
77.00 | |
27/32 |
VELLUTINI CORP. DBA ROYAL ELECTRIC CO.*
Sacramento | royalelect.com L. Frank Vellutini, President |
Los Angeles International Airport RSA Improvements Los Angeles 11.00 |
100 Electrical |
64.75 | |
28/25 |
FOUNDATION CONSTRUCTORS INC.
Oakley | foundationpiledriving.com Derek Halecky, President & CEO |
America Center II San Jose 11.38 |
100 Sitework/Excavation/
Foundation |
53.47 | |
29/— |
WASHINGTON IRON WORKS*
Gardena | Daniel Welsh, President |
John Wayne Airport Santa Ana 12.52 |
100 Steel Erection/
Fabrication |
51.25 | |
30/35 |
COMFORT SYSTEMS USA
Houston | comfortsystemsusa.com Brian Lane, CEO |
Not Provided |
94 Mechanical 6 Plumbing |
49.85 | |
31/36 |
BARNUM & CELILLO ELECTRIC INC.*
Sacramento | barnumcelillo.com Fred Barnum, President |
The Orchards at Walnut Creek Walnut Creek 3.80 |
100 Electrical |
49.00 | |
32/— |
XCEL MECHANICAL SYSTEMS INC.
Gardena | xcelmech.com Kevin Michel, President |
Watt Plaza Central Plant Los Angeles 6.15 |
75 Mechanical 25 Plumbing |
47.90 | |
33/37 |
MISSION BELL
Morgan Hill | missionbell.com Glenn Ripley, President & CEO |
LinkedIn San Francisco 3.79 |
100 Interior Finishes/
Millwork |
45.97 |
|
34/26 |
ARDENT SERVICES LLC
Carson | ardent.us Patrick Malloy, Executive Vice President |
Refinery Unit Carson 2.67 |
100 Electrical |
45.80 | |
35/— |
SHAW & SONS INC.
Costa Mesa | shawconstruction.com Ron Shaw, President |
Water Garden Santa Monica 6.26 | 100 Concrete |
42.00 | |
36/40 |
UNIVERSAL PLANT SERVICES INC.
Deer Park, Texas | universalplant.com Bradley Jones and Stewart Jones, Co-CEOs |
Not Provided |
100 Other Project Types |
40.15 |
|
37/42 |
INTREN INC.
Concord | INTREN.com Jason Combs, Regional Vice President |
Not Provided |
100 Utility |
36.27 |
|
38/45 |
O.C. MCDONALD CO.
San Jose | ocmcdonald.com James McDonald, President |
UCSC - Coastal Biology Building Santa Cruz 6.00 |
60 Electrical 40 Sheet Metal |
35.00 |
|
39/41 |
NIBBI CONCRETE
San Francisco | nibbiconcrete.com Robert L. Nibbi, President |
Mission Bay Block 6E Housing San Francisco 6.84 |
100 Concrete |
32.87 |
|
40/48 |
GEORGE E MASKER INC.*
Oakland | Maskerpainting.com Alan A. Bjerke, President |
Transbay Transit Center San Francisco 2.80 |
100 Painting & Coatings |
28.58 |
|
41/— |
DEL MONTE ELECTRIC*
Dublin | delmonteelectric.com Scott Mullins, Vice President |
Santa Rita Jail PV Installation Dublin 1.70 |
100 Mechanical |
28.00 |
|
42/49 |
K&S AIR CONDITIONING INC.*
Orange | kandsair,com Steve Patz, President |
Marciano Art Foundation Los Angeles 1.47 |
100 Mechanical |
24.13 |
|
43/55 |
GIROUX GLASS INC.*
Los Angeles | girouxglass.com Nataline Lomedico, President & CEO |
LAX Terminal 1 Southwest Airlines Los Angeles 10.08 |
100 Glazing/Curtain Wall |
22.65 |
|
44/51 |
TRUESDELL CORP. OF CALIFORNIA
Tempe, Ariz. | truesdellcorp.com Kurt L. Clink, President & CEO |
Caltrans 01-0B2404 Humboldt City 0.88 |
100 Other Project Types |
19.14 |
|
45/— |
PRO-CRAFT CONSTRUCTION INC.
Redlands | procraftconstructioninc.com Timothy McFayden, CEO |
Perris HS Addition Phase 2A Perris 1.30 |
70 Plumbing 30 Utility |
15.80 |
|
46/58 |
ROY E. WHITEHEAD INC.
Riverside | royewhitehead.com David R. Whitehead, CEO |
Ventura County Medical Center Hospital Replacement
Wing Ventura 2.08 |
100 Other Project Types |
10.10 |
|
47/65 |
SURE STEEL INC.
South Weber, Utah | suresteel.com Mark Carter, CEO |
Newpark Mall AMC San Jose 5.69 |
100 Steel Erection/
Fabrication |
9.06 |
|
48/— |
THE MORSE GROUP INC.
Las Vegas | themorsegroup.com Lou Rotello, President |
Graton Casino Resort Rohnert 17.98 |
100 Electrical |
5.70 |
|
49/67 |
RESOLUTE PERFORMANCE CONTRACTING
Tempe, Ariz. | resolutepc.com Malcolm Persen, President |
Newport Mesa SD Solarization Newport Beach 2.99 |
75 Steel Erection/
Fabrication 25 Concrete |
5.30 |
|
50/62 |
BRONCO ELECTRIC INC.
Bakersfield | broncoelectric.com Bret Smith, COO |
Not Provided |
100 Electrical |
2.92 |
|
*REVENUE WAS PROVIDED ON A FISCAL-YEAR BASIS. ALL OTHERS PROVIDED CALENDAR-YEAR DATA, WHICH IS PREFERRED. **INCLUDES REVENUE GENERATED FROM GENERAL CONTRACTING, DESIGN-BUILD AND CONSTRUCTION MANAGEMENT AT-RISK AS WELL AS FEES FROM PROGRAM MANAGEMENT AND CONSTRUCTION MANAGEMENT FOR FEE. |
Copyright ©2024. All Rights Reserved BNP Media.
Design, CMS, Hosting & Web Development :: ePublishing