July 2020
The Top Contractors list, published annually, ranks the general contractors, both publicly and privately held, based on construction contracting-specific revenue.
More Information on Top Contractors By Sectors:
View Top Contractors By Sectors
Related Article:
California Top Contractors; Northwest Top Contractors
Click below for earlier editions:
2019 | 2018 | 2017 | 2016 | 2015 | 2014 | 2013 | 2012 | 2011 | 2010 | 2009
Rank 2020/2019
|
Company
Location / Website Top Officer |
Largest Project to Break Ground
Location Total Construction Cost ($ Mil.) |
Market Sectors By % of Revenue
|
Regional Rev. 2019 ($ Mil)**
|
|
---|---|---|---|---|---|
1/1
|
SWINERTON San Francisco | swinerton.com Eric Foster, CEO |
LAX Intermodal Transportation Facility - West
Los Angeles 248.00 |
83 General Building
9 Power 8 Transportation |
3,018.64
|
|
2/2
|
WEBCOR San Francisco | webcor.com Jes Pedersen, CEO & President |
945 West 8th Street
Los Angeles 400.00 |
94 General Building
5 Transportation |
2,116.95
|
|
3/11
|
HATHAWAY DINWIDDIE CONSTRUCTION CO.* San Francisco | hdcco.com Greg Cosko, President & CEO |
Gateway of the Pacific, Phase 2
South San Francisco, Calif. Not Provided |
99 General Building
1 Telecommunications |
2,041.17
|
|
4/5
|
TURNER CONSTRUCTION CO. Anaheim, Calif. | turnerconstruction.com Michael J. Kuntz, Executive Vice President |
Zeiss Innovation Center Dublin, Calif. 123.00 |
73 General Building
17 Transportation 5 Interior/Tenant Improvements |
1,908.00
|
|
5/9
|
DEVCON CONSTRUCTION INC. Milpitas, Calif. | devcon-const.com Gary Filizetti, President |
Not Provided
|
Not Provided
|
1,814.50
|
|
6/6
|
HENSEL PHELPS Irvine, Calif. | henselphelps.com Bradley Jeanneret, Executive Vice President |
Delta Skyway @ LAX
Los Angeles 1,000.00 |
58 General Building 41 Transportation 1 Power |
1,806.00
|
|
7/3
|
DPR CONSTRUCTION Redwood City, Calif. | dpr.com Jody Quinton, Executive Vice President |
Confidential Project
Pleasanton, Calif. 261.09 |
68 General Building
20 Industrial Process 9 Telecommunications |
1,762.05
|
|
8/10
|
CLARK GROUP Irvine, Calif. | clarkconstruction.com Carlos Gonzalez, Regional Executive Officer, Senior Vice President |
Route 60 Pavement Rehabilitation in LA County - 710 to the 605
Los Angeles Not Provided |
84 General Building
16 Transportation |
1,682.37
|
|
9/7
|
MCCARTHY BUILDING COS. Newport Beach, Calif. | mccarthy.com Michael Myers, Regional President |
San Jose State University - Interdisciplinary Science Building
San Jose, Calif. 164.69 |
89 General Building
5 Transportation 4 Industrial Process |
1,567.80
|
|
10/4
|
KIEWIT CORP.* Omaha | kiewit.com Rick Lanoha, CEO |
Not Provided |
42 Transportation
20 Power 16 Water Supply |
1,264.76
|
|
11/13
|
THE WHITING-TURNER CONTRACTING CO. Irvine, Calif. | whiting-turner.com Len Cannatelli, Executive Vice President |
Cubic Headquarters Campus
San Diego Not Provided |
97 General Building
3 Industrial Process |
1,167.51
|
|
12/15
|
PCL CONSTRUCTION ENTERPRISES INC.* Glendale, Calif. | pcl.com Deron Brown, President & COO, U.S. Operations |
LAX Consolidated Rent-a-Car Facility
Los Angeles 1,106.62 |
68 General Building
21 Transportation 7 Petroleum |
1,054.99
|
|
13/—
|
TRUEBECK CONSTRUCTION San Mateo, Calif. | truebeck.com Sean Truesdale, Co-Founder & CEO |
Indeed Office Tenant Improvement
Sunnyvale, Calif. 8.50 |
78 General Building
12 Other Project Types 9 Interior/Tenant Improvements |
1,006.90
|
|
14/8
|
AECOM CONSTRUCTION MANAGEMENT* Los Angeles | aecom.com Robert Hart, Executive Vice President |
United Airlines LAX East Aircraft Maintenance Complex
Los Angeles Not Provided |
89 General Building
11 Transportation |
925.00
|
|
15/19
|
BALFOUR BEATTY US San Diego | balfourbeattyus.com Brian Cahill, President, California - US Buildings; Crandall Bates, Vice President, West - US Civils |
Sterling Natural Resource Center
Highland, Calif. 162.75 |
61 General Building
27 Transportation 10 Sewerage/Solid Waste |
912.56
|
|
16/14
|
RUDOLPH AND SLETTEN San Carlos, Calif. | rsconstruction.com Martin Sisemore, President & CEO |
BioMed Realty - APEX Biotechnology Campus
San Diego 78.80 |
92 General Building
8 Interior/Tenant Improvements |
865.00
|
|
17/18
|
SKANSKA Los Angeles | usa.skanska.com Jim Link, Regional Executive Officer (US Building); Mike Aparicio, Executive Vice President (US Civil) |
SR 905 Otay Mesa Port of Entry Project
San Diego 100.60 |
76 Transportation
24 General Building |
836.04
|
|
18/12
|
LEVEL 10 CONSTRUCTION Sunnyvale, Calif. | level10gc.com Dennis Giles, President |
Confidential Project
Sunnyvale, Calif. 80.00 |
100 General Building
|
812.60
|
|
19/27
|
XL CONSTRUCTION Milpitas, Calif. | xlconstruction.com Richard Walker, President & COO |
Confidential Project
Mountain View, Calif. 126.00 |
100 General Building
|
671.00
|
|
20/—
|
VANCE BROWN INC. Palo Alto, Calif. | vancebrown.com Loren Brown, President |
Brokaw
San Jose, Calif. 300.00 |
92 General Building
8 Interior/Tenant Improvements |
660.00
|
|
21/17
|
PRIMORIS SERVICES CORP. Lake Forest, Calif. | prim.com Scott Summers, President of Pipeline; Tim Healy, President of Power and Industrial |
Not Provided
|
Not Provided
|
648.20
|
|
22/—
|
CHARLES PANKOW BUILDERS LTD. Pasadena, Calif. | pankow.com Jack P. Mollenkopf Jr., Regional Vice President |
Southeast Community Center at 1550 Evans
San Francisco 71.10 |
100 General Building
|
611.54
|
|
23/21
|
O'NEIL INDUSTRIES INC. / W.E. O'NEIL CONST. CO. OF CALIFORNIA El Segundo, Calif. | weoneil.com John Finn, President, W.E. O'Neil Const. Co. of California |
West Edge - Martin Expo Town Center
Los Angeles 302.00 |
93 General Building
6 Manufacturing 1 Power |
604.66
|
|
24/—
|
KPRS CONSTRUCTION SERVICES INC. Brea, Calif. | kprsinc.com Joel Stensby, President & Founder |
Entrada Culver City, Calif. 135.00 |
100 General Building
|
599.00
|
|
25/—
|
ECC Burlingame, Calif. | ecc.net Paul Sabharwal, Chairman |
Camp Fire
Butte County, Calif. 342.62 |
100 Other Project Types
|
576.27
|
|
26/26
|
THE WALSH GROUP LTD. Corona, Calif. | walshgroup.com Matthew Walsh, Co-Chairman |
400 Paul Avenue Building C
San Francisco 32.00 |
55 Transportation 24 General Building 20 Sewerage/Solid Waste |
558.75
|
|
27/20
|
C.W. DRIVER COS. Pasadena, Calif. | cwdriver.com Dana Roberts, CEO |
SchoolsFirst Credit Union - RH2 Headquarters
Tustin, Calif. Not Provided |
100 General Building
|
531.30
|
|
28/23
|
BERNARDS San Fernando, Calif. | bernards.com Greg Simons, President |
Martin Luther King Jr. Behavioral Health Center
Los Angeles 245.00 |
100 General Building
|
531.10
|
|
29/28
|
BCCI CONSTRUCTION CO. San Francisco | bcciconst.com Michael Scribner, President & CEO |
Not Provided
|
93 Interior/Tenant Improvements 7 General Building |
511.15
|
|
30/29
|
FLATIRON CONSTRUCTION INC. Benicia, Calif. | flatironcorp.com Mike Costa, Vice President, Division Manager |
West Mission Bay Drive
San Diego 103.82 |
85 Transportation
8 Water Supply 6 Sewerage/Solid Waste |
510.84
|
|
31/—
|
DOME CONSTRUCTION INC.* South San Francisco, Calif. | domebuilds.com Robert Lynch, CEO |
AlloCAR T Manufacturing Newark, Calif. 56.00 |
61 General Building
36 Other Project Types 3 Manufacturing |
466.00
|
|
32/—
|
MATT CONSTRUCTION Santa Fe Springs, Calif. | mattconstruction.com Steven F. Matt, CEO & Chairman |
One Westside
Los Angeles 198.97 |
100 General Building |
416.03
|
|
33/36
|
SUNDT CONSTRUCTION INC.* Irvine, Calif. | sundt.com Dan Dumke, Senior Vice President, Building Group, California |
San Mateo Nutrient Removal and Wet Weather Flow Management Upgrade and Expansion San Mateo, Calif. 375.00 |
76 General Building
9 Transportation 8 Power |
415.67
|
|
34/—
|
SKYLINE ENTERPRISES San Francisco | skylineenterprises.com David Hayes, CEO |
Confidential Project
San Francisco 58.34 |
93 Interior/Tenant Improvements
7 General Building |
412.11
|
|
35/32
|
C. OVERAA & CO. Richmond, Calif. | overaa.com Jerry Overaa, CEO |
Patterson Pass Water Treatment Project
Livermore , Calif. 76.30 |
41 General Building 28 Sewerage/Solid Waste 13 Water Supply |
410.80
|
|
36/30
|
MILLIE AND SEVERSON INC.* Los Alamitos, Calif. | mandsinc.com Jon Severson, President |
AC Marriott Hotel + Residence Inn Oakland, Calif. 97.66 |
100 General Building
|
403.66
|
|
37/33
|
CAHILL CONTRACTORS San Francisco | cahill-sf.com Kathryn Cahill Thompson, CEO |
Mission Bay South Block 6 West
San Francisco 93.00 |
100 General Building
|
391.58
|
|
38/—
|
MORLEY BUILDERS Santa Monica, Calif. | morleybuilders.com Charles Muttillo, President |
LAX ConRAC
Los Angeles 163.48 |
100 General Building
|
378.70
|
|
39/31
|
PLANT CONSTRUCTION CO. LP* San Francisco | plantconstruction.com Chris Rivielle, President & CEO |
Pier 70 Building 12 San Francisco Not Provided |
100 General Building
|
374.43
|
|
40/35
|
LAYTON CONSTRUCTION CO. LLC Irvine, Calif. | laytonconstruction.com John Thornton, Executive Vice President |
UPS Warehouse Visalia, Calif. 51.00 |
100 General Building |
321.34
|
|
41/—
|
ROEBBELEN CONTRACTING INC. El Dorado Hills, Calif. | roebbelen.com Kenneth J. Wenham, President & CEO |
College of Alameda Liberal Arts Oakland, Calif. 48.00 |
100 General Building
|
320.48
|
|
42/34
|
NIBBI BROTHERS GENERAL CONTRACTORS San Francisco | nibbi.com Robert L. Nibbi, President |
Brooklyn Basin Parcel F
Oakland, Calif. 94.00 |
97 General Building
3 Transportation |
296.11
|
|
43/—
|
SUKUT CONSTRUCTION LLC* Santa Ana, Calif. | sukut.com Steve Yurosek, CEO & President |
West Fontana Channel
Fontana, Calif. 23.08 |
63 Sewerage/Solid Waste
15 Water Supply 12 Transportation |
290.00
|
|
44/39
|
MOOREFIELD CONSTRUCTION INC.* Santa Ana, Calif. | moorefieldconstruction.com Mike Moorefield, President |
El Paseo Marketplace - Phase II Fresno, Calif. 24.06 |
100 General Building
|
284.77
|
|
45/56
|
THE PENTA BUILDING GROUP Los Angeles | pentabldggroup.com Paul Dutmer, Director of Los Angeles |
Confidential Tribal Casino Project Southern California 75.00 |
100 General Building
|
282.35
|
|
46/38
|
LYLES CONSTRUCTION GROUP* Fresno, Calif. | lylesgroup.com Rick Amigh, President & CEO |
WWTP Salt Mitigation Upgrade Project
Beaumont, Calif. 53.30 |
54 Sewerage/Solid Waste
23 General Building 16 Water Supply |
281.10
|
|
47/51
|
OHL USA INC. Irvine, Calif. | ohlna.com Tony Bagheri, Executive Vice President, Western USA |
Valencia Water Reclamation Plant Advanced Water
Treatment Facility
Valencia, Calif. 87.36 |
74 Transportation 22 Sewerage/Solid Waste 4 Water Supply |
251.32
|
|
48/58
|
GRAYCOR* San Jose, Calif. | graycor.com Dave Wing, President |
Confidential Project Not Provided Not Provided |
100 General Building |
241.38
|
|
49/37
|
DEACON CONSTRUCTION LLC* Citrus Heights, Calif. | deacon.com John Clouse, Chief Operations Officer |
Not Provided |
100 General Building
|
232.55
|
|
50/43
|
R.D. OLSON CONSTRUCTION Irvine, Calif. | rdolson.com William J. Wilhelm, President |
Bolsa Row Apartments
Westminster, Calif. 54.00 |
100 General Building
|
231.00
|
|
51/—
|
LUSARDI CONSTRUCTION CO. San Marcos, Calif. | lusardi.com Scott Free, CEO |
Central Station Sunnyvale
Sunnyvale, Calif. 35.47 |
100 General Building |
228.00
|
|
52/46
|
SHAWMUT DESIGN AND CONSTRUCTION* Los Angeles | shawmut.com Greg Skalaski, Executive Vice President, Shawmut West |
Confidential Retail Project
Los Angeles 30.20 |
100 General Building
|
224.60
|
|
53/49
|
AVALONBAY COMMUNITIES INC. Irvine, Calif. | avaloncommunities.com Rob Salkovitz, Senior Vice President Construction |
Not Provided |
100 General Building
|
223.70
|
|
54/41
|
TRAYLOR BROS. INC. Long Beach, Calif. | traylor.com Michael T. Traylor, Co-President |
Not Provided |
96 Transportation 2 Water Supply 2 Other Project Types |
219.66
|
|
55/—
|
AMOROSO CONSTRUCTION* Redwood Shores, Calif. | sjamoroso.com Dana C. McManus, CEO |
VA Stockton Community-Based Outpatient Clinic French Camp, Calif. 143.59 |
90 General Building 8 Water Supply 2 Transportation |
219.00
|
|
56/42
|
CLUNE CONSTRUCTION Los Angeles | clunegc.com Randy Starbird, Executive Managing Director, President, West Region |
Confidential Media Project Los Angeles 27.45 |
100 Interior/Tenant Improvements
|
215.82
|
|
57/53
|
BROWN CONSTRUCTION INC.* West Sacramento, Calif. | brown-construction.com Ron Brown, President & CEO |
Not Provided |
100 General Building
|
207.90
|
|
58/52
|
BIG-D CONSTRUCTION-PACIFIC Pleasanton, Calif. | big-d.com Ken Mitchell, President |
IPC Building 19 Tracy, Calif. 46.50 |
97 General Building
3 Industrial Process |
183.11
|
|
59/—
|
PINNER CONSTRUCTION CO. Anaheim, Calif. | pinnerconstruction.com Dirk Griffin, CEO |
Ulysses S. Grant High School
Valley Glen, Calif. 144.63 |
100 General Building
|
179.68
|
|
60/44
|
AUSTIN INDUSTRIES Dallas | austin-ind.com David B. Walls, President & CEO |
USC Seismic Upgrades
Los Angeles 2.18 |
97 Transportation
3 General Building |
177.08
|
|
61/50
|
HARPER CONSTRUCTION CO. San Diego | harperconstruction.com Jeffrey Harper, President |
Ammunition Supply P-1310
Camp Pendleton, Calif. 40.38 |
100 General Building
|
174.31
|
|
62/57
|
MANSON CONSTRUCTION CO.* Long Beach, Calif. | mansonconstruction.com Jim McNally, COO, Executive Vice President |
Not Provided |
100 Transportation
|
165.87
|
|
63/24
|
HOLDER CONSTRUCTION San Jose, Calif. | holderconstruction.com Gavin Kalley, Vice President |
Not Provided |
51 Telecommunications
49 General Building |
165.00
|
|
64/—
|
APTIM San Diego | aptim.com Ulrika Messer, Senior Director, Program Manager |
Fort Irwin Bridge Contract (HDSS)
Fort Irwin, Calif. 44.20 |
47 Hazardous Waste
27 Petroleum 23 Other Project Types |
161.33
|
|
65/55
|
VCC LLC Irvine, Calif. | vccusa.com Don Davis, Senior Vice President |
Stonestown Galleria
San Francisco 70.00 |
100 General Building
|
154.32
|
|
66/48
|
BLACH CONSTRUCTION CO.* San Jose, Calif. | blach.com Mike Blach, Chairman |
Gateway at Millbrae Station
Millbrae, Calif. 300.00 |
93 General Building
7 Interior/Tenant Improvements |
152.00
|
|
67/47
|
KITCHELL CORP. San Diego | kitchell.com Michael Wolf, Regional Vice President, Kitchell Contractors; Russell Fox, President, Kitchell CEM |
Shasta County Redding Courthouse Redding, Calif. 127.68 |
99 General Building
1 Other Project Types |
138.55
|
|
68/—
|
ARCO CONSTRUCTION COS. St. Louis | arcoconstruction.com Craig Bridell, Chairman |
Grossmont Skilled Nursing
La Mesa, Calif. Not Provided |
Not Provided |
111.87
|
|
69/—
|
ODIN CONSTRUCTION SOLUTIONS Rocklin, Calif. | odinconstruction.com Louay M. Owaidat, President & CEO |
NE Main Drainage Canal West Levee, Reach H
Natomas, Calif. 14.94 |
69 Master-Planned Development/
Site Infrastructure
31 General Building |
96.12
|
|
70/—
|
RYAN COS. US* La Jolla, Calif. | ryancompanies.com Chris Wood, President, West Region |
Vantage Point
Poway, Calif. 38.10 |
100 General Building
|
96.04
|
|
71/40
|
HASKELL Jacksonville, Fla. | haskell.com James L. O’Leary, President & CEO |
Not Provided |
57 Industrial Process
27 General Building 9 Manufacturing |
85.07
|
|
72/73
|
FERROVIAL AGROMAN US CORP. El Segundo, Calif. | fauscorp.com Jose Vicente Baraja Marti, Director West |
Not Provided |
100 Transportation
|
81.70
|
|
73/62
|
DUKE CONSTRUCTION Indianapolis | dukerealty.com Pat Walsh, Senior Vice President, Construction |
Not Provided |
93 General Building 5 Interior/Tenant Improvements 2 Transportation |
80.19
|
|
74/—
|
CSI CONSTRUCTION CO.* Foothill Ranch, Calif. | csigc.com Joe Hall, Vice President |
AC Hotel San Rafael
San Rafael, Calif. 31.50 |
100 General Building
|
73.60
|
|
75/—
|
AGI GENERAL CONTRACTING Stanton, Calif. | agigc.com Chris Gautreau, CEO & President |
Friends Church Pavilion Yorba Linda, Calif. 6.70 |
100 General Building
|
62.50
|
|
76/60
|
MILENDER WHITE Newport Beach, Calif. | milenderwhite.com Adam Mack, District Manager, Executive Vice President |
Inglewood Market Gateway Inglewood, Calif. 71.69 |
99 General Building
1 Telecommunications |
60.53
|
|
77/70
|
TIS CONSTRUCTION SERVICES INC. Carson, Calif. | tisusa.com Farrel Stevins, CEO |
Honey Build Out Los Angeles 13.16 |
100 General Building
|
54.94
|
|
78/78
|
HITT CONTRACTING INC. Santa Clara, Calif. | HITT.com John Kane, Senior Vice President |
Confidential Project 1550 Space Park Drive Santa Clara, Calif. 24.02 |
41 Telecommunications
37 Interior/Tenant Improvements 22 General Building |
50.73
|
|
79/63
|
MCSHANE CONSTRUCTION CO. Irvine, Calif. | mcshane-construction.com Charlie Stone, Vice President, Regional Manager |
Home Chef Western Distribution Center
San Bernardino, Calif. Not Provided |
100 General Building
|
50.32
|
|
80/67
|
RBA BUILDERS INC. Huntington Beach, Calif. | rbabinc.com Robert Anderson, CEO |
Not Provided |
100 General Building
|
50.00
|
|
80/66
|
THE NAZERIAN GROUP Encino, Calif. | nazerian.net Vartan Nazerian, President |
GCC Increment II - Glendale Community College
Glendale, Calif. 22.94 |
100 General Building
|
50.00
|
|
82/—
|
HEALTHCARE DESIGN & CONSTRUCTION Tustin, Calif. | hdcbuilders.com Scot Berlinski, President |
Observation Unit and Tunnel - St. Mary Medical Center Apple Valley, Calif. 4.63 |
100 General Building
|
48.70
|
|
83/72
|
CRB Carlsbad, Calif. | crbusa.com Chuck Glynn, Regional Leader |
Facility Expansion
Carlsbad, Calif. 23.75 |
89 Industrial Process
11 Interior/Tenant Improvements |
48.26
|
|
84/—
|
PHOENIX INDUSTRIAL INC. Vancouver, Wash. | phxind.com Joe Hutton, President |
CalPlant1 Manufacturing Facility
Willows, Calif. 22.00 |
55 Industrial Process
45 Manufacturing |
46.60
|
|
85/64
|
GARNEY HOLDING CO. Tracy, Calif. | garney.com Bill E. Williams, Vice President |
Northeast Antioch Annexation Water and Sewer Facility
Antioch, Calif. 4.10 |
65 Sewerage/Solid Waste
35 Water Supply |
42.73
|
|
86/—
|
LANE INDUSTRIES INC. Henderson, Nev. | laneconstruct.com Farid Hamad, Vice President of Construction |
Not Provided |
100 Transportation
|
39.90
|
|
87/69
|
BERGMANKPRS Brea, Calif. | bergmankprs.com Mark C. Bergman, Managing Member |
Veteran's Plaza Riverside, Calif. 5.54 |
100 General Building
|
31.67
|
|
88/75
|
DENNIS GROUP Carlsbad, Calif. | dennisgroup.com Kyle Kartchner, Senior Partner |
Not Provided |
100 Industrial Process
|
26.63
|
|
89/—
|
PAXON ENERGY & INFRASTRUCTURE SERVICES Pleasanton, Calif. | paxonengineering.com Nooshin Behroyan, CEO |
Oakland Compressor Station
Oakland, Calif. 5.00 |
100 Petroleum
|
26.30
|
|
90/54
|
JTM CONSTRUCTION GROUP INC. (AN AFFILIATE OF J.T.
MAGEN & CO.) Los Angeles | jtmagen.com Vincent Ryan, Vice President |
Latham & Watkins
Los Angeles 6.60 |
64 Telecommunications
36 General Building |
23.90
|
|
91/76
|
BRAHMA GROUP INC.* Ridgecrest, Calif. | brahmagroupinc.com Mark Day, CEO |
SVM ESP Repairs
Trona, Calif. 5.46 |
69 Power
27 Industrial Process 4 Petroleum |
22.86
|
|
92/74
|
SLETTEN COS. Las Vegas | slettencompanies.com Dan Eden, Division Manager |
Todd Road Jail Health and Programming Unit Santa Paula, Calif. 50.19 |
99 General Building
1 Power |
18.64
|
|
93/—
|
ROBINSON CONSTRUCTION CO. Perryville, Mo. | robinsonconstruction.com Paul E. Findlay, President |
Not Provided |
100 Industrial Process
|
4.26
|
|
94/77
|
IPS-INTEGRATED PROJECT SERVICES LLC Irvine, Calif. | ipsdb.com Patrick Bucklen, Principal |
USC Clean Room Tool Hookup
Los Angeles 13.00 |
100 Industrial Process
|
3.87
|
|
*REVENUE WAS PROVIDED ON A FISCAL-YEAR BASIS. ALL OTHERS PROVIDED CALENDAR-YEAR DATA, WHICH IS PREFERRED. |