Morrison-Maierle Inc.
Morrison-Maierle prepared a final design, grading and tailing management plan and a construction cost estimate for the Mattie V Creek stream channel restoration project. This project restores the lower portions of Mattie V Creek, which had become disconnected from Ninemile Creek and prohibited fish passage to spawning habitat in the upper portions of the watershed. The project reduces water temperatures and sediment input, and improves water quality in Ninemile Creek.
Structural Systems
Pablo Pedestrian Bridge
HDR Engineering Inc.
HDR designed and provided construction administration support for a bicycle/pedestrian bridge to allow safe access over Highway 93 and provide a link between the CSKT Tribal Complex and Salish Kootenai College. The project included piers to support the 265-ft, supplier-designed span and the ADA ramps and landings necessary for bike and pedestrian access to both ends of the over-crossing span.
Waste and Stormwater
Bozeman Water Reclamation Facility
HDR Engineering Inc. and Morrison-Maierle Inc.
Small Projects Category (under $2.5 million)
St. Paul Trail Bridge
Morrison-Maierle Inc.