Tennessee SR 68 at MP 5.2 Emergency Slide
Rhea County, Tenn.
Award of Merit
Contractor: GeoStabilization International
Owner: Tennessee Dept. of Transportation
Lead Design Firm: GeoStabilization International
When heavy rains caused part of one lane of Tennessee SR 68 to give way, local residents were faced with a two-hour detour. Coupled with SR 68 being designated as a primary detour route for the nearby interstate highway, Tennessee DOT and GeoStabilization International scrambled to begin repair work within 48 hours. Once a new foundation was in place, crews constructed a Geosynthetically Confined Soil retaining wall, built in 8-in. lifts, to become the roadbed for the refurbished roadway. The contractor was able to deliver the repairs in just over two months, while also enabling roadway access during the entire process.
Back to "Southeast's Best Projects Shine With Stellar Results"