Wyoming State Capitol
Cheyenne
Award of Merit
Owner: State of Wyoming
Lead Design Firm: HDR
General Contractor: JE Dunn Construction
Engineers/Consultants: BenchMark Engineers; Silman; Loring Engineering; CSHQA
Subcontractors: Douglass Colony Group; Encore Electric; Johnson Controls Inc.; Martin/Martin Wyoming; Quality Electric; Rapid Fire Protection
This building modernization included new construction as well as extensive renovations, adding nearly 95,000 sq ft to a 130-year-old government complex. The project upgraded all electrical systems in the Capitol, along with the installation of new audio-visual equipment and improved lighting, including LED retrofits and a lightning protection system.
Originally, light was provided to the Capitol by gas lamps and skylights. Over time, fluorescent and incandescent lighting was added. This renovation includes 3,500 light fixtures, with 20% of those being historic or historic replicas. Every light in the complex is now LED, including new stage lighting that illuminates the stained glass ceilings in the House and Senate chambers.
Back to Number of Best Projects Entries Remains Strong Despite the Pandemic