The Panama Canal Authority awarded the contract to design a bridge on the Atlantic side of the Panama Canal near the Gatun Locks to a Chinese-U.S. joint venture. The China Communications Construction Co. and the Louis Berger Group offered a $4.66-million proposal, the lowest bid offered.
The structure will be 75 meters above sea level and 5 km long, including the approaches. The other firms proffering bids included TYPSA Principia, URS Holdings, Puente de Colón JV, ARUP and T.Y. Lin International.
The bridge is required to maintain a road passage across the isthmus with the construction of the new larger locks required for the $5.2-billion Third Lane Expansion Project.