In July, Harvey | Harvey-Cleary celebrated the mat pour at 415 Colorado in downtown Austin, Texas. The placement consisted of 3,150 cubic yd of concrete from 315 trucks placed over a 10-hour time period.
Trahan captured the shot using his iPhone from the terrace of a neighboring building.
“For us, the shot represents the beginning of a project that we’re extremely excited about,” Trahan says. “A mat pour is a long process, but it generates so much enthusiasm for what’s to come, and we love the teamwork and collaboration that it takes to accomplish this. It sets the perfect tone for this project.”
The 415 Colorado Tower is a multiuse skyscraper that will feature approximately 328 apartment units and 110,000 sq ft of office space.