To accommodate a growing congregation and its evolving needs, the design and construction team removed the main sanctuary to make room for the new two-story multiuse fellowship hall for First Unitarian Church in Dallas. Dedicated to serving and expanding the church’s diverse congregation, Gensler’s reimagined design aimed to create an open, welcoming experience that fosters strong community bonds.
The 19,505-sq-ft addition, which broke ground in September 2018, ties into an existing four-building church campus, with structures dating back to the 1940s. Preserving the historical integrity of the Raible Chapel and the Memorial Garden was paramount to the client, and daily site meetings proved key to delivering the project on budget and on time in January 2022.
Because the site is located directly adjacent to single family homes, the team was required to maintain an especially clean and quiet construction zone. To accommodate this, Ridgemont limited construction hours. The team reclaimed materials from the demolition, reusing the original stone that was on the exterior as well as the original pavers from the 1960s and the existing benches.