Flash flooding in spring 2023 created severe drainage issues and washed out two existing crossings on SR-322. In this emergency repair, the contractor raised the road profile and installed 48-in. and 36-in. reinforced concrete pipe at multiple sites, including near Eagle Valley Resort and reservoir. These interventions redirected water flow and will help prevent future flooding.
After assembling a workforce and securing worker lodging in just one week, the team quickly mobilized. Despite the challenge of working with multiple vendors to speed deliveries, the project team completed the project a day ahead of schedule.