Located on 55 acres at Phoenix Sky Harbor International Airport, the $92.3-million expansion and renovation project included 60,339 sq ft of construction and 39,624 sq ft of renovations.
Completed May 2021, the 213,000-sq-ft Tower D was constructed at budget and on schedule south of the main entrance at the Chandler Regional Medical Center.
This 18-level, 290-room downtown Tempe hotel, completed at budget and on schedule October 2021, features the highest open-air rooftop bar in the Valley, a designer lobby suggesting desert canyon walls, a restaurant with an exhibit kitchen, as well as a coffee shop and extensive meeting and event space.
The $798,000 Desert Aviation Center at the North Las Vegas Airport is a completely transformed 1970s building, including office and hangar space, landscaping additions, parking lot improvements and energy-efficient LED lighting to replace outdated exterior incandescent fixtures.
A collaboration between the city and Arizona State University, the $65-million center in downtown Mesa includes a three-story, 118,000-sq-ft Media and Immersive eXperience (MIX) Center and the Plaza @ Mesa City Center.
Designed to re-envision the way neuroscience care is delivered, the $36.2-million medical building for the renowned Barrow Neurological Institute is located on the St. Joseph’s Hospital & Medical Center campus in Phoenix.
Creating a feeling of wellness and connection to the outdoors, this five-story, 280,000-sq-ft veterans’ health care facility in Phoenix maximizes natural daylight, has a solar-power system and is certified as a Green Globes project for its high sustainability standards.
Completed in May 2022, this 3-mile-long alignment serves students, professionals visitors and event-goers, passing through Arizona State University’s main campus, continuing by the Frank Lloyd Wright-designed Gammage Theater, down Mill Avenue, the city’s hub of dining, shopping and nightlife and along Rio Salado Parkway to Tempe’s business district.
The $7.6-million dam rehabilitation project, completed within budget in 25 months, included a labyrinth spillway, seepage and filter protection, raising the elevation of the top of the dam and improving the control tower and lake drain system that regulate the water level.