Three-building $1.8B project next to lake in Tempe, Ariz. faced issues in foundation work, which penetrates three levels down into the Salt River’s alluvial soil and cobble.
Mortenson’s new 15,257-sq-ft office space is located on the first floor of the Beam on Farmer, Arizona’s first cross-laminated timber (CLT) Class A office building.
This 18-level, 290-room downtown Tempe hotel, completed at budget and on schedule October 2021, features the highest open-air rooftop bar in the Valley, a designer lobby suggesting desert canyon walls, a restaurant with an exhibit kitchen, as well as a coffee shop and extensive meeting and event space.
Completed in May 2022, this 3-mile-long alignment serves students, professionals visitors and event-goers, passing through Arizona State University’s main campus, continuing by the Frank Lloyd Wright-designed Gammage Theater, down Mill Avenue, the city’s hub of dining, shopping and nightlife and along Rio Salado Parkway to Tempe’s business district.
A “riddle” is how Brandon Dillingham, managing director for Houston-based real estate developer Hines, describes 100 Mill, the 17-story, mixed-use tower his company and Cousins Properties are integrating into a 2.5-acre parcel in Tempe, Ariz.
Once a single-story building that housed a semiconductor business, the $4.73-million Circuit project in Tempe, Ariz., is now an office space that features an “amenity porch” as a shared outdoor space.
The home of the Arizona State University football team will undergo several structural, facility and technological upgrades before to the start of the 2017 season.