The three-story, 36,000-sq-ft academic building provides a much needed new home for the college’s growing computer science department as well as a permanent makerspace. Unlike traditional campus structures, the building is a physical embodiment of the college’s forward-looking culture.
Even under the best conditions, the condensed 22-week timeline to convert a former pen manufacturing plant into the app-based health care company’s new 76,000-sq-ft headquarters would have been challenging.
Located in rural northeastern California, the three-building, 28,000-sq-ft hospital complex is a critical access facility serving a 4,500-sq-mile area.
Construction on the 37,000-sq-ft building was on track for early completion in mid-March 2020 when COVID-19 shelter-in-place (SIP) orders brought work to a screeching halt. Yet within 48 hours, the project team was ready to safely resume work, deploying protective equipment and new safety protocols that, under normal circumstances, might have required several weeks to plan and implement.
Despite initial concern that the project might be vulnerable to as much as $1 million in cost overruns, the two-phase, $36.5-million construction program was ultimately completed under budget thanks to innovative value engineering and negotiated change order requests.
The relocated Patsaouras Bus Plaza provides LA Metro’s transit users easier connections to bus lines serving Union Station. By widening both sides of the 30-year-old El Monte Busway Bridge, the project team created a 200-ft-long, 18-ft-wide concrete platform with benches, ticket machines and wayfinding kiosks, all covered by a steel canopy.
Taking advantage of reduced traffic volumes resulting from statewide pandemic-related closures, the project team and Caltrans partnered to fast-forward this complex deck replacement on a Bay Area artery that typically handles nearly a quarter-million vehicles each day.