As part of a comprehensive $1-billion multiphase expansion of Analog Devices’ semiconductor factory to enhance its manufacturing capabilities, this $115-million project adds 25,000 sq ft of clean room capacity, bringing the client’s total manufacturing space up to 118,000 sq ft.
Scope of work for this build-out of a high-end camera store within a luxury shopping development included high-end millwork, finishes and display cases, a customer care room and back of house employee areas, all completed within three months.
As part of an extensive campus modernization project for a confidential high-tech client, this five-building, 782,000-sq-ft hub is designed to draw employees back to the office with dynamic workspaces and retail and culinary areas.
As the first ground-up facility built specifically for a WNBA franchise, this $64-million project represents an unprecedented investment in elite women athletes.
A new direct access off-ramp from eastbound SR 520 carries traffic to the Overlake Village area in Redmond through a 130-ft-long cut-and-cover tunnel running beneath 148th Avenue Northeast.
Extending Sound Transit’s Link Light Rail Line 3.7 miles from Shoreline to the Lynnwood Transit Center required two elevated stations with vertical circulation, 2.3 miles of elevated guideway and 1.4 miles of at-grade track.
To provide increased functionality to this medical-surgical unit, the project team led a full demolition and reconstruction of the hospital’s eighth floor.