The six-lane, 1,445-ft-long Anacostia River crossing uses an above-deck arch design coupled with cable-stay bridge technology to transform the South Capitol Street corridor into an iconic, grand urban boulevard.
Cargo transfer operations at the Port of Long Beach are poised to become both greener and more efficient over the next decade with the $1.567-billion Pier B On-Dock Rail Support Facility.