When a car has seen the end of its days or there is scrap metal left over from a demolition project, it’s often sent to Evraz Recycling for a variety of metal recycling services.
Intended to provide education and support to the Denver writing community, this $7.2-million three-story office building for the nonprofit Lighthouse Writers Workshop features an exposed steel and wood structure with cross-laminated timber (CLT) panels on the floor and roof decks.
As part of a three-mile greenway project that connects neighborhood green spaces, this pocket park and intersection improvements project turned outdated infrastructure into safe and culturally relevant play spaces.
A four-month tenant improvement project converted a portion of Meow Wolf’s Denver exhibition Convergence Station into an immersive bar lounge that features just one 90-degree angle and an overall circular design with curvature walls and a ceiling-suspended stage crown.
The $162-million Great Hall Program Phase 2 is actually the first of two phases aimed at improving security and efficiency while increasing the airport’s capacity to accommodate 100 million annual passengers.