When I met John Shook, one of the world’s leading lean management experts in Boston at the Lean Construction Institute Congress in 2015, a colleague asked him how far the construction industry in the U.S. has come with lean construction after 17 years.
Think of construction projects as production systems where safety, quality, material, equipment, people and reporting are all tied to the same physical output and production flow.