Strengthening the transmission and distribution grid, increasing distributed generation and even trimming vegetation would likely do more to improve grid resilience than a proposed draft order from the Trump administration that would force system operators to keep coal and nuclear plants operating for at least two years.
The cold weather that swept across the Eastern Seaboard in early January is heating up the debate over the need for a more robust infrastructure to deliver natural gas to New England.