Natural gas generating plants built despite punishing conditions in Michigan's upper peninsula providing power to residents and customers of Upper Michigan Energy Resource Corp.
KBS Constructors and DLR Group were able to transform a more than 50-year-old building that previously served as both a hospital and then a high school into a modern learning center.
The National Veterans Memorial and Museum has three concentric rings up to 60 ft tall and 300 ft in diameter. Turner Construction used a 3D construction model to build it.
American Airlines' Hangar 2 maximizes aircraft parking and minimizes total gross area. The hangar is supported by 7,000 tons of steel, making it the longest span, dual-threshold airline hangar in the world.
To fast-track the schedule of McDonald’s new headquarters in Chicago’s West Loop, the interior buildout began while the core and shell of the building were still under construction.
Completed in just 20 months, the $31.5-million Kennedy Mill Bridge (Kentucky 152) safely connects Kentucky’s Mercer and Garrard counties across Herrington Lake, replacing a 94-year-old, triple-span truss structure that had endured numerous closures and repairs in its final years.