Production facility set to make sustainable aviation fuel from ethanol when on line in 2025, would be "the world's largest," says developer Summit Agricultural Group.
This $58-million project to build a 138-kV gas-insulated substation challenged the team to work with a site footprint and schedule that were both tight.
Touted by University of Missouri officials as the most ambitious project in its 180-year history, the $221-million Roy Blunt NextGen Precision Health Building is designed to enable researchers to expedite delivery of innovations from the lab to clinical treatment.
The project team was hired to build a 138/23-kV gas-insulated substation and associated infrastructure in the heart of Pittsburgh for electric utility Duquesne Light.
The Marine Corps Air Station (MCAS) Camp Pendleton partnered with Burns & McDonnell to offset the habitat loss of two federally endangered bird species — the least Bell’s vireo and southwestern willow flycatcher — due to necessary infrastructure and safety improvements at the air station.
As the first utility-scale solar plant for Lockheed Martin, this 24-MWDC photovoltaic facility—boasting nearly 55,000 solar panels—is projected to reduce annual energy costs by as much as $4 million.