The U.S. Dept. of Transportation on Dec. 21 granted the MBTA a $100-million installment of a $1-billion grant for the 4.7-mile light-rail line from Cambridge to Medford.
Two of the three design-build teams shortlisted to build the long-awaited Massachusetts Bay Transportation Authority’s Green Line Extension project have certified that their proposals will meet or be below the MBTA’s $1.3 billion cost limit.
CH2M Hill Inc. has won a program and construction management contract for the Massachusetts Bay Transportation Authority’s rebooted Green Line Extension.