Located at the heart of UT Arlington’s main campus is its newest facility, featuring a mix of classrooms; flexible and state-of-the-art technology; enriched learning spaces; teaching and research labs; faculty and staff offices; study and support spaces; and infrastructure support space.
After multiple additions and renovations over its 60-year lifespan, the original Bellaire High School was no longer able to support modern educational practices. Funded by Houston ISD’s 2012 Bond Program, the $122.9-million facility will support the community far beyond the next 60 years.
After three years of planning, budgeting and preconstruction, along with pandemic-related delays, the Avalanche Locker Room project was finally greenlit in February 2022.
To provide a new patient care unit for forensic services within the Memorial Hospital Central Emergency Dept. in Colorado Springs, crews performed a 3,400-sq-ft build-out of existing shelled space.
The new home of Drexel’s College of Medicine and the College of Nursing and Health Professionals totals 12 stories—with a MEP penthouse that spans two more levels—and totals 494,688 sq ft. Inside are 178,500 sq ft of classroom space, 98,700 sq ft of office/support space and 87,000 sq ft of lab/simulation space.
Located on Pittsburgh’s historic “Automobile Row,” where Model Ts were assembled, sold and serviced, the vacant Ford Motor plant was repurposed into a research facility.