The construction of the 1,200-ft-long, 12-span Jordan River Pedestrian Bridge is the long-anticipated final link in a 106-mile-trail system that connects 34 cities from Ogden to Provo.
Six piers constructed as part of a $23-million interchange upgrade in Iowa will have to be modified as a result of a contractor’s measurement error that left them too tall for a planned flyover bridge.