Toyota’s new West Coast distribution headquarters consists of a 155,000-sq-ft post-production building, 5,200-sq-ft car wash and a 3,500-sq-ft fuel island to replace multiple existing structures.
This new Fireboat Station includes a 20,000-sq-ft fire station building, 11,200-sq-ft covered fireboat bay enclosure, geotechnical improvements, site utilities, stand-by generator, fire pump enclosure, stormwater BMP, landscape, fencing and hardscape improvements.
Spacious and light-filled, the Alumni Center supports California State University, Long Beach’s (CSULB) expansive alumni community and current students.
It's not every day I get to sign the last steel beam on a major project before it is hoisted into place. It is even more rare that I get to share this honor with a two ft-tall Megellanic penguin dressed in his black and white birthday suit.