Chicago-based Invenergy is proposing to build four new wind farms and two solar farms to provide 700 megawatts of generation that would triple existing renewable energy available on Long Island.
Following congressional passage in December of a multiyear extension of the wind-energy production tax credit and investment tax credit, the wind industry is breezing ahead with a new lease on life.
Congress is wrestling with its first energy policy update since 2005, and there is some concern that it may not be passed this year. That may not be all bad.
With wind turbine projects in 18 states, renewable energy developer Iberdrola has experienced a wide spectrum of site conditions, but those at its $400-million, 208-MW Amazon Wind Farm US East project are unlike anything the firm has ever encountered.
The U.S. Interior Dept. has approved construction of a 287-MW solar-photovoltaic project on 1,767 acres of federal land in the Mojave Desert, near Baker, Calif.