Fair Plaza Garage includes 384 parking spaces, a new 5-ft by 12-ft precast storm culvert beneath it, a new sanitary line and a generator for emergency power.
New Orleans’ Audubon Aquarium chose to replace its massive 65,000-sq-ft traditional roof with a more sustainable system after Hurricane Katrina damaged the roof in 2005.
San Antonio Independent School District’s Alamo Stadium, built in 1939 by the Works Progress Administration, is a nationally registered historic landmark.
In 2010, the U.S. Army Corps of Engineers Galveston District launched a $52-million design-build project to repair nine work areas at six dilapidated jetties and dikes along the 750-mile Texas coastline.
After decades of political, funding and environmental challenges, Austin’s Water Treatment Plant No. 4 was completed, commissioned and started up in November 2014.
Constant challenges for the project team included keeping the existing plant operating at peak performance during heavy construction, keeping plant staff safe, outfall permitting, high water levels of the Mississippi River and maintaining safe site access for the plant staff.