With a construction schedule developed around the Endicott College’ academic calendar, detailed coordination and meticulous schedule management were critical on the $44.5-million Samuel C. Wax Academic Center.
One of the first large-scale multifamily Passive House-certified developments in Massachusetts, this $34.2-million project was also the largest new multifamily affordable housing projects in Cambridge in 40 years.
The team preserved and restored the iconic Indiana limestone exterior of this 350,00-sq-ft, 1931-era Hartford, Conn. landmark with Art Deco features while the interior was fully gutted and renovated to create a modern office layout for state employees.
The decade long project to replace water siphons serving residents of Staten Island in New York City produced multiple challenges for the construction team.
After hosting numerous memorable sporting events during its 40-year history, the Carrier Dome achieved a landmark of its own with the replacement of its original air-supported roof—the last of its kind in the U.S.
Stabilization of the wall strengthens the city’s waterfront business corridor against rising flood levels and protects an adjacent wastewater interceptor sewer.
Sustainability, history, quality and safety were themes throughout the process of replacing a deteriorated timber-decked bridge above a NJ Transit rail line with a high-strength prestressed single-span concrete box beam superstructure fabricated off site to help expedite construction.
Located beneath three active rail lines at Rotterdam Junction, N.Y., the 107-ft-long reinforced concrete pedestrian tunnel is among the last components to complete the 750-mile Empire State Trail.