The team that built the 230,000-sq-ft addition to the American Museum of Natural History pulled all the stops to create a lobby atrium that evokes a canyon.
Texas DOT and the Flatiron/Dragados joint venture announced that they have settled last concerns over the proposed design of jointed pier segments that stalled the nearly $1-billion project last July.