The inadequacy of existing safeguards to protect bridges and other infrastructure from ever-larger container ships was considered in a House hearing May 15, a day after the NTSB released its preliminary report on the collapse of the Francis Scott Key Bridge.
Long-anticipated FERC rules require power providers to conduct 20-year-ahead plans for long-term transmission needs and give agency backstop siting authority for projects that cross grid boundaries.