There is a long list of issues associated with formal requests for information (RFI), but leveraging technology to shorten that list has proved to be difficult.
Chicago-based wind-generation developer Invenergy and GE Renewable Energy last month made public the construction start in Oklahoma of a 2,000-MW wind farm—set to be the largest in the U.S. and the second largest in the world.
When FEMA’s National Flood Insurance Program (NFIP) expires next month, the pressure will be on Congress to reauthorize the program, ideally by adopting long-delayed reforms.