Now that Mineta San Jose Airport has its new 12-gate Terminal B and concourse, an upgraded Terminal A and a Consolidated Rental Car Center and public parking garage, regional passengers can now take the time to absorb the enhanced, modern atmosphere and, literally, bask in its glow. The $1.3-billon project, almost a decade in design and development, certainly improves Silicon Valley�s main transportation hub operationally, but it does something else as well: It enhances the region�s image. Or, as Steve Weindel, Gensler�s principal in charge of design, put it: The designers set out to �create an iconic building that people
Tutor Perini Corp. reports that Caltrans has informed the firm that it has been awarded a $215-million contract for construction of the fourth bore tunnel at the Caldecott Tunnel section of Highway 24 in Alameda and Contra Costa counties near Oakland. Photo: Caltrans Caltrans awarded the contract to Tutor-Saliba Corp., a wholly-owned subsidiary of Tutor Perini Corp. The tunnel will be approximately 990 meters long and will add two additional lanes of traffic in the westbound direction and is designed to alleviate traffic congestion along the Route 24 corridor. Construction is anticipated to start in January and will take approximately