Located on the 66th and 67th floors of the 72-story US Bank Tower in downtown Los Angeles, Lincoln International’s 26,000-sq-ft Los Angeles office offers breathtaking views from the ocean to the mountains.
To improve accessibility and minimize flood risk in San Marcos Creek’s alluvial plain as well as preserve creek habitat and improve the ability to traverse the area, this $72.5-million project included construction of two new bridges at Via Vera Cruz and Bent Avenue, along with sidewalks and bike lanes.
Featuring a wide range of team-based student learning spaces, social spaces and departmental offices for faculty and staff, the $87.4-million Education Building II (EDII) is a strategically located, highly visible structure on campus that creates a new home for the medical school.
When MiraCosta College set out to transform the 27-acre eastern portion of its campus, it sought a solution that would reflect its mission to foster the success of its students within a caring and equitable environment.
The exterior and interior designs on this LEED Gold-certified specialty medical office building are based on the unique experiences of cancer patients and create an uplifting healing environment.
Located on the first floor of Cedars-Sinai Marina Towers, this new breast imaging center is strategically designed to meet the high technical standards of both Cedars-Sinai and the facility’s affiliated user group, ensuring the seamless integration of services.
As the second-busiest commercial crossing on the U.S.-Mexico border, the Otay Mesa LPOE processed an estimated $13.5 billion in exports and $37.4 billion in imports in 2021.
One of Southern California’s largest energy storage systems is now operational, providing clean power and improved grid resiliency across southwest Los Angeles.