In just 33 weeks, an abandoned 130,000-sq-ft big-box retail space was transformed into an office and community center that provides health and wellness services.
Chicago’s Lakefront Trail Pedestrian Bridge incorporates architectural steel railings and panels, custom steel deck nosing and a LED lighting system to improve visibility.
On Nov. 11, 2020, a trucking accident on the Brent Spence Bridge—a key thoroughfare between Covington, Ky., and Cincinnati—caused a fire that damaged the double-decker cantilevered truss bridge’s upper deck floor system steel, drainage, deck, barriers, electrical components and the lower deck’s overlay.
Adjacent to one of the largest college football stadiums in the U.S. and situated on a site of a decommissioned power plant, Michigan State University’s STEM Teaching and Learning Facility faced a mountain of challenges.
The $59-million, 146,000-sq-ft Iowa State University Student Innovation Center was designed to be flexible. Unlike so many buildings on campus, the SIC was not defined by one college, user group or entity as the sole occupant.
Built as a public-private partnership—a first for the U.S. Dept. of Veterans Affairs—this three-level, 157,000-sq-ft outpatient care facility maximized the benefits of construction manager at-risk project delivery and concurrent designer-contractor collaboration.
Designed to replicate the warmth and flow of a private health care experience within a public health department, the new Will County Dept. of Public Health aims to meet the needs of a population that is expected to nearly double in the next 30 years.
The new Johnson County Courthouse in Olathe, Kan., consolidates the 10th Judicial District Court, the district attorney’s office and supporting spaces into a seven-story cast-in-place concrete structure.
Red Rock Dam, a U.S. Army Corps of Engineers facility on the Des Moines River near Pella, Iowa, got a new powerhouse courtesy of Stantec’s design and a new generation license from the Federal Energy Regulatory Commission.