An early site package, civil package, and utility relocation was required before drawings on the Creighton University School of Dentistry were entirely completed.
The B.E. Smith Family Center is a place where equipment and facilities are adapted to provide all children accessibility. Turner sequenced slab-on-grade concrete placements and overhead MEP installation to allow maximum design time and flexibility for future equipment installation.
The central tower of the Village of Oswego Police Headquarters is clad with an evacuated tube solar hot water renewable energy system used to provide hot water to the building’s systems.
This $150-million renovation and expansion added a new nine-story, 200,000-sq-ft tower to the courthouse complex to maintain secure transportation of prisoners from the jail to the courthouse. Construction Manager Clark Construction completed the complex job on time.
The Ottumwa Generating Station Selective Cataltyic Reduction is ENR Midwest's Best Project for Excellence in Safety as well as an award of merit winner for energy/industrial.
Natural gas generating plants built despite punishing conditions in Michigan's upper peninsula providing power to residents and customers of Upper Michigan Energy Resource Corp.
KBS Constructors and DLR Group were able to transform a more than 50-year-old building that previously served as both a hospital and then a high school into a modern learning center.
The National Veterans Memorial and Museum has three concentric rings up to 60 ft tall and 300 ft in diameter. Turner Construction used a 3D construction model to build it.