This $91-million, 223,000-sq-ft building not only features laboratory, office and administrative spaces, but also a basement vivarium, two underground cisterns with 24,000 gallons of capacity and tunnels designed to connect to two future buildings.
Georgia State University’s $63-million, 200,000-sq-ft law college—its first dedicated legal education facility—includes 21 classrooms, a conference center, a 230-seat ceremonial courtroom and a two-story law library and sits on a tight, 2.4-acre site in downtown Atlanta.
Auburn University’s Wilford and Kate Bailey Small Animal Teaching Hospital—one of the largest teaching and referral veterinary hospitals in the U.S.—proved a challenge for construction manager Brasfield & Gorrie.
Housing the world’s first wind-wave storm-surge simulator, the Marine Technology Life Sciences Seawater Research Building features an 8,520-sq-ft Surge Structure Atmosphere Interaction research facility designed for the study of hurricane physics.
This ambitious project replaced Fort Lauderdale-Hollywood International Airport’s original 5,300-ft runway by expanding and elevating it to an 8,000-ft-long, 150-ft-wide structure that extends over the existing airport perimeter road, Florida East Coast Railway and U.S. Highway 1.
To build Gwinnett County, Ga.’s 664,000-sq-ft Discovery High School—all under one roof—contractor Carroll Daniel Construction Co. had to transform a 90-acre site that contained an old tire warehouse.
In only 25 months over the course of two school years, Robins & Morton orchestrated the $39-million, 210,000-sq-ft phased renovation and expansion of Opelika High School.