The world’s largest manufacturer of garbage disposals and instant hot water dispensers wanted a modern, state-of-the-art work environment that would optimize productivity and help attract and retain employees.
Independence Library and Apartments is a 65,000-sq-ft mixed-use project developed through a partnership with Chicago Public Library and the Chicago Housing Authority.
Prestage Farms has grown from a four-person family business in 1983 into a company that employs more than 2,700, contracts with more than 470 farms and produces more than 1.4 billion lb of pork and turkey each year.
The UC Gardner Neuroscience Institute is a first-of-its kind facility for treatment of neurological disorders that houses 15 clinical specialty areas under one roof with every inch designed to blend patient care and architecture.
CannonDesign and International Contractors Inc. were the architecture and construction management team charged with taking the community of Burbank, Ill.’s vision of a 21st-century learning environment and turning into a reality.
A comprehensive renovation and new addition was needed to enhance scientific interaction between faculty and students through flexible spaces. The program addresses the laboratory and office needs of both the School of Physics and Astronomy and the Department of Earth Sciences.
An early site package, civil package, and utility relocation was required before drawings on the Creighton University School of Dentistry were entirely completed.
The B.E. Smith Family Center is a place where equipment and facilities are adapted to provide all children accessibility. Turner sequenced slab-on-grade concrete placements and overhead MEP installation to allow maximum design time and flexibility for future equipment installation.
The central tower of the Village of Oswego Police Headquarters is clad with an evacuated tube solar hot water renewable energy system used to provide hot water to the building’s systems.
This $150-million renovation and expansion added a new nine-story, 200,000-sq-ft tower to the courthouse complex to maintain secure transportation of prisoners from the jail to the courthouse. Construction Manager Clark Construction completed the complex job on time.