Through careful phasing, innovative materials and luxury details, the team on the $8.1-million Four Seasons Hotel modernization in Austin was able to deliver the project on a fast-paced schedule without disrupting operations or the high-end atmosphere.
The team on the $1.4-billion reconstruction of a 6.5-mile section of I-35W in downtown Fort Worth relied on tactical safety planning, fast-paced scheduling and robust engineering to deliver this megaproject two months ahead of schedule, within budget and without major injuries.
Renovation of the historic Amick Building in Denver’s Santa Fe Arts District converted a dilapidated and mostly vacant structure into a vibrant office and retail space.
To convert a former office building into luxury apartments and retail, the project team on 640 Magazine Street was tasked with preserving a historic structure that consisted of three buildings that were built and renovated at three different times.
The Argyros Performing Arts Center sits in the heart of downtown Ketchum, replacing the former facility with a new flexible-use performance space that includes a main stage theater scalable up to 460 seats.