The Minnesota State Capitol is on the National Register of Historic Places but, at 109-years-old, it was in serious need of repair and modernization before JE Dunn got to work.
Indiana University's $35 million, 41,000-sq-ft renovation and 50,000-sq-ft expansion of the venerable Simon Skjodt Assembly Hall sought to build on its legacy of winning.
Designed to evoke a sense of the “thin space” between Heaven and Earth, constructing the United Methodist Church of the Resurrection required the project team to nearly move both.
When flood waters breached Lake Delhi Dam, Stanley Consultants worked with the Lake Delhi Combined Recreational Facility and Water Quality District to redesign and rebuild it.
The $22 million revamp of this 50-year-old railroad station called for a complete modernization of a rail hub that serves millions annually. While it was still open.